LokalizacjaWietlin III 2015
Status Finished
As part of the general contractor construction of two halls was carried out about the 3000m2 total area along in with office buildings about area 250 m2 made in the traditional technology.

Hall about the steel construction, quilted - 1008m2 covered with the polyurethane sandwich panel.

Investment carried out in the system design and build, all works were carried out through Stalkoncept Sp. z o.o. as the general contractor comprehensively "up to the key".
30
10/15
15:00
October 30, 2015
finishing works
7
08/15
12:15
August 7, 2015
Casing of the roof and walls